
Success Case: pH Adjustment in a Chemical Manufacturing Plant
The Challenge: A chemical factory in South America was using a carbon steel dosing tank for pH adjustment (dosing Sulfuric Acid). The tank corroded within 12 months, leading to leaks and environmental safety risks.
Our Solution: Kopay Intl provided a 1000L PE Automatic Dosing Skid with a specialized acid-resistant diaphragm pump.
The Results:
Zero Corrosion: The PE tank has shown no signs of degradation after 24 months of continuous use.
Operational Safety: The enclosed skid design prevented accidental spills and improved site safety.
Cost Savings: The client saved thousands in replacement costs and avoided government environmental fines.
Frequently Asked Questions (FAQ)
Q: Can this unit handle dry powder polymer?
A: No, this unit is designed for liquid chemicals or pre-mixed solutions. For dry powder preparation, please see our [Automatic Polymer Preparation Unit].
Q: What is the lead time for a customized PE skid?
A: Standard units are usually in stock. Custom configurations (special pumps or PLC control) typically ship within 10-15 days.
Our dosing units are the perfect partner for our [Multi-Disc Screw Press] to ensure maximum solid-liquid separation.”
















